<title>Last Minute Planned Downtime - When should it be logged as unplanned?</title>
<link>https://itsmfuk.site-ym.com/forums/posts.aspx?topic=1113781</link>
<description></description>
<lastBuildDate>Sat, 6 Jun 2026 23:28:24 GMT</lastBuildDate>
<pubDate>Fri, 29 May 2015 11:20:12 GMT</pubDate>
<copyright>Copyright &#xA9; 2015 itSMF UK</copyright>
<atom:link href="https://itsmfuk.site-ym.com/forums/topic_rss.asp?id=1113781" rel="self" type="application/rss+xml"></atom:link>
<item>
<title>Last Minute Planned Downtime - When should it be logged as unplanned?</title>
<link>https://itsmfuk.site-ym.com/forums/posts.aspx?topic=1113781</link>
<guid>https://itsmfuk.site-ym.com/forums/posts.aspx?topic=1113781</guid>
<description><![CDATA[<font color="#000000" face="Times New Roman" size="3">
</font>
<p style="background: white; margin: 0cm 0cm 7.5pt; line-height: 14.25pt;"><span style='color: rgb(51, 51, 51); font-family: "Helvetica","sans-serif"; font-size: 11.5pt;'>Hi,</span></p>
<font color="#000000" face="Times New Roman" size="3">
</font>
<p style="background: white; margin: 0cm 0cm 7.5pt; line-height: 14.25pt;"><span style='color: rgb(51, 51, 51); font-family: "Helvetica","sans-serif"; font-size: 11.5pt;'>We recently had an issue occur within
our data centre where we could see that we were going to have a failure which
would cause a critical system to go down. As we had a limited amount of
pre-warning, our team notified the end users and scheduled some downtime to
resolve the problem. The issue we have is that we do not have any definition of
how much notice needs to be given to end users of planned downtime outside of
the regular maintenance schedule.</span></p>
<font color="#000000" face="Times New Roman" size="3">
</font>
<p style="background: white; margin: 0cm 0cm 7.5pt; line-height: 14.25pt; word-spacing: 0px; -ms-word-wrap: break-word; widows: 1; -webkit-text-stroke-width: 0px;"><span style='color: rgb(51, 51, 51); font-family: "Helvetica","sans-serif"; font-size: 11.5pt;'>Could
anyone share their practices / industry standard views as to when a planned
outage should be logged as unplanned. i.e. If the customer is given 24hrs
notice then the downtime would be logged as planned, with less than 24hrs it
should be logged as unplanned.</span></p>
<font color="#000000" face="Times New Roman" size="3">
</font><font color="#000000" face="Times New Roman" size="3">
</font>
<p style="background: white; margin: 0cm 0cm 7.5pt; line-height: 14.25pt; word-spacing: 0px; -ms-word-wrap: break-word; widows: 1; -webkit-text-stroke-width: 0px;"><span style='color: rgb(51, 51, 51); font-family: "Helvetica","sans-serif"; font-size: 11.5pt;'>This
is important for our SLA's which are presented to our customers, but which also
directly impact our bonuses.</span></p>
<font color="#000000" face="Times New Roman" size="3">
</font><font color="#000000" face="Times New Roman" size="3">
</font>
<p style="background: white; margin: 0cm 0cm 7.5pt; line-height: 14.25pt; word-spacing: 0px; -ms-word-wrap: break-word; widows: 1; -webkit-text-stroke-width: 0px;"><span style='color: rgb(51, 51, 51); font-family: "Helvetica","sans-serif"; font-size: 11.5pt;'>Thanks
for your help,</span></p>
<font color="#000000" face="Times New Roman" size="3">
</font>]]></description>